Use this url to cite publication: https://hdl.handle.net/20.500.14911/118323
The operation of phase 1 of new European Gauge railway line Rail Baltica
Publication Type (CRIS)
Straipsnis konferencijos medžiagoje Web of Science duomenų bazėje / Article in conference proceedings in Web of Science database (P1a1)
Publication Type (eLABa)
Straipsnis konferencijos darbų leidinyje Web of Science DB / Article in conference proceedings Web of Science DB (P1a)
Author(s)
Title [en]
The operation of phase 1 of new European Gauge railway line Rail Baltica
Jonas Jonaitis
Is part of
Transport means - 2005 : proceedings of the 9th international conference, October 20-21, 2005, Kaunas University of Technology, Lithuania : [selected papers]
Published In
| Year | Start Page | End Page |
|---|---|---|
2005 | 234 | 238 |
Publisher
Kaunas : Technologija
Referenced in Database(s)(DBs)
Extent
p. 234-238
Science / Art Area
Technologijos mokslai / Technological sciences (T)
Field of Science / Art
Transporto inžinerija / Transport engineering (T003)
Abstract (en)
The preliminary layout design takes into account stations for passenger or/and freight traffic. In the same way crossing stations have been located along the alignment for both train crossing and overpassing. The operational tasks of the EG (European Gauge) and WG (Wide Gauge) Yards are presented in this paper. The design criterion for Crossing Stations are identical for all alternatives. The New Railway Line shall run for two kinds of transport: passenger and freight transport. Railway operations will be analysed for each alternative. Both alternatives, eastern and western, will be based on the Corridor I and IXd connection and operations in KLN (Kaunas Logistic Node).
Resource Type (COAR)
TextConference outputConference proceedingsConference paper
Language
Anglų / English (en)
Country
Lietuva / Lithuania (LT)
Owning collection
ISSN (of the container)
1822-296X
eLABa ID
28756866