Application of hybrid SWARA–BIM in reducing reworks of building construction projects from the perspective of time
| Author | Affiliation |
|---|---|
Khalesi, Hamidreza | Islamic Azad University |
Balali, Amirhossein | Islamic Azad University |
Valipour, Alireza | Islamic Azad University |
| Year | Volume | Issue | Start Page | End Page |
|---|---|---|---|---|
2020 | 12 | 21(8927) | 1 | 21 |
| URI | Access Rights |
|---|---|
| https://hdl.handle.net/20.500.14911/150863 | |
| https://www.mdpi.com/2071-1050/12/21/8927 | Viso teksto dokumentas (atviroji prieiga) / Full Text Document (Open Access) |
| https://talpykla.elaba.lt/elaba-fedora/objects/elaba:73281963/datastreams/MAIN/content |
One of the major issues of the construction industry has been the “reworks” that affect the time, quality, and cost of projects. Therefore, reworks and the ineffective use of site resources and materials will always result in significant losses on projects. The development of information technology has led to the widespread use of Building Information Modelling (BIM) to enhance the delivery of more sustainable building construction projects. The purpose of this study is to combine the Step-wise Weight Assessment Ratio Analysis (SWARA) method and BIM technologies to identify and reduce time delays caused by reworks in construction projects. Firstly, 49 rework causes in residential buildings were identified and ranked. Then, BIM was generated and compared to the initial model. It was observed that working hours were reduced by 4.6%. Moreover, using an Earned Value Management (EVM) system, a 0.06 increase in Schedule Performance Index (SPI) factor was illustrated. Results obtained by this study provide an effective step in reducing a project’s time in the construction industry.
This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).